精品精品国产理论在线观看,亚洲中国久久精品无码,久久国产精品成人片免费,日韩国产精品欧美一区二区

Stock code:871165
Mobile phone +8613829250070 中文
Online Message Common problem

Industry information

Your current position: Home > News> Industry information

Precautions of central feed system installation

Source: Popularity:5366 Publication time:2017-11-23 15:47:29 smallmiddlebig

The central feeding system realizes the 24 hours continuous feed operation for the pellets, and can change the colors flexibly to meet the requirements of multi-color and multi-varieties of the products. Depending on the production of different molding machines, flexible changes in the amount of feed. Multiple feed pipe design, to ensure the diversification of the main requirements. The system has a variety of monitoring and protection functions, work safe and reliable. The last Hengrong technicians also introduced the advantages of planning and using the central feeding system in the injection molding workshop, and today we will share the installation precautions for the central feeding system.


中央供料系統(tǒng)


Central feed system installation has the following precautions:


1, the size of the machine placed the exact location of the way drainage pipe.
2, pay attention to the raw material room and system control layout.
3, observe the plant wall structure, determine the weight of the pipeline.
4, pay attention to the overhead crane, ceilings, pillars.
5, the central feeding pipe, try to reduce corners.
6, the pipe is allowed to control the condition about 3 meters high, easy to install and follow-up maintenance.
7, when connecting the pipe to ensure that the pipe clamp is the center of the docking, the pipeline is strictly prohibited leakage.
8, pay attention to the installation of pipe injection molding machine in charge of position, so as not to oppose it will not affect the appearance.

On the central feed system installation precautions, we introduce to you here. The ease of use of the central feed system reduces the labor costs and, secondly, the reduction of raw material belts and associated auxiliaries next to the injection molding machine increases space utilization. In addition, due to the central feeding method, correspondingly reduced a lot of stand-alone equipment, it saves energy and reduce maintenance costs, installation and application is very extensive.

Relevant information
主站蜘蛛池模板: 疏附县| 平泉县| 禹州市| 云和县| 仙桃市| 兰西县| 景德镇市| 镇江市| 鸡泽县| 石河子市| 壶关县| 清涧县| 南陵县| 榕江县| 龙胜| 新密市| 澄江县| 德钦县| 定结县| 于田县| 新巴尔虎左旗| 微山县| 开原市| 南丰县| 攀枝花市| 宜阳县| 昆山市| 三亚市| 浠水县| 曲周县| 平阳县| 濉溪县| 通江县| 灵石县| 京山县| 察隅县| 北海市| 施秉县| 遂宁市| 潞城市| 沙雅县|